Tuesday, March 30, 2010

Construction Dad

Kerris has been calling James "Dad the Builder" lately (based on the TV show Bob the Builder). We're making some progress though it feels slow moving. The new hallway walls are sheetrocked, have baseboard trim, and James installed both of the doors. I've sanded the sheetrock and am prepping to paint the wall in our bedroom and the hallway. Thayer's closet is almost done. James installed baseboard, I painted it and have applied 3 layers of poly with one left remaining.

Here's the new hallway taken from the bathroom before the doors went in. James has since trimmed the wall on the right and mudded the corners.
Thayer's new closet. His clothes will hang on the right and his dresser will be tucked behind on the left.
Our new bedroom door, a view of the hallway once you get to the top of our stairs.
The new hallway and the entrance to the bathroom on the right.